Skip to main content

High Performance Modular Homes

Out performing modular homes in the North Country! 802-338-1719 .
About Us
Contact Us
Member Login
HP Constructed Homes
2 story duplex
2 Story with in law
Ranch in Brattelboro
3 Box Ranch Franklin
Ranch Essex with garage
Modular Capes
Cape chalet
Vaulted Cape Chalet
4 Box cape
cape with shed dormer and
Ranch 7 boxes with attach
ranch with composite fron
2013 Projects at a glance
2014 Projects at a glance
Start to finish
Modular floor plans
Interior photos
Modular financing
Manufacturer Specs
High Performance Specs
Recent Projects
A project to show the process of building a new home

This home is a 66' cape with sunroom and attached 2 car garage, built on a walk out basement with a drive under garage. Upstairs has storage above the garage a full 20' shed dormer off the rear with 2 front facing 8' dormers. It took 3 1/2 months to complete from when the home was set and included scheduling of over 20 sub-contractors for various parts of the construction. We began with clearing the property and then blasting ledge for 2-1/2 weeks before any foundation or road access work. The home rated 7 on the HERS index and received 2nd place in energy efficiency for home builders in 2016. 


Concrete footings and walls poured now prep for slab

Set day unwrapping the modular boxes so they can be craned onto the foundation

Making sure the roof is weather tight, shingles to get laid down

Spray foam in the upstairs of unfinished portion of the cape 

Working to build the front screened in porch

Beginning the rear deck framing

Garage doors installed

Front porch railing work

Composite deck boards being installed

T&G pine installed on the sun room ceiling

Sun room ceiling almost complete

Ceiling soffit installed on the porch

A little window install

Septic installation

Kitchen cabinets installed

Upstairs 8' dormer with 2 bench seats

Master bath shower with custom jets, niche, railfall shower head and glass doors

Upstairs bedroom with dormer

Off living room stairs to office and bedroom

Dining room

   Deciding where to blast and where not too

Holes drilled for blasting 

Two boxes are in place, now to set the garage boxes, lift the roof, assemble the shed dormer and install the front dormers.

Siding in process on the rear shed dormer

Spray foam in the walk out basement/ drive under garage area

Upstairs in unfinished portion office which sits next to the storage space of garage

Framing walls in the basement to create storage and space for future finish space

Framing of walls in the unfinished portion of the cape built 2 large bedrooms with a bathroom between

Solar trackers installed and catching some rays!

Hardwood flooring being laid in the dining and kitchen areas

Beginning of the kitchen cabinet installation

Custom tile shower installed in master bathroom

Boiler room

Porch privacy walls 

Basement stairs now just need the railing

And we have the start of a railing

Beginning of a driveway to the drive under garage

Bedroom with bath attached

Kitchen with a counter top installed

Lights going on the rear deck

Rear view of garage

Front porch with lights on the railing